“Our” Fiberoptic Cable

OK. We have to share it with a few hundred other people! Lol.

A few years ago, our telephone company, CenturyLink, brought fiber optic cable to the end of Road Gulch Road along CO69. Now they wanna connect us to that fiber optic cable. Presently we are connected by a copper, multiple conductor cable. We have no idea what this augers for us but we do hope it improves our phone service. And maybe encourages cell service providers to install towers.

I had talked to one of the team doing this for CenturyLink, a contractor from Salida. He was very aggravated they are demanding that this company get ‘er done by Christmas when they had months (or years) to do this. In much better weather.

First they tried to dig a hole with a backhoe and got about a foot down before it wouldn’t go any deeper into the frozen ground. Then the company sent them back with a horizontal borer to cross under the roads, CO28 and CO69. Mission accomplished at each end. But those pulled the familiar orange fiberoptic duct under them.

But the team is now putting the plastic fiberoptic cable directly into the ground! Usually we see these projects with the burial of orange duct with the fiber optic cable itself pulled through the duct later. This method also allows several cables be pulled through the same duct.

Anyway, this project is installing one cable by direct burial.

First they had to break through the frost line the backhoe failed to penetrate. This is the machine they are using. This method of breaking the furrow makes the burial machine work smoother, also.

This thing goes ahead and breaks up the ground ahead cutting a furrow. It left big chunks of frozen soil behind. Note how close it is to the rock wall; the road is even closer to the wall further down the road; there the operator actually plowed the road

Then the rest of the team followed doing their things.

The front thing with the roll of dark “wire” is the cable burier. Behind it is a backhoe doing something, I think using the back of the bucket to tamp the furrow. Then the grader was reshaping the ditch so it looked like they had never been there. Lol.

The fun thing to me was the cable burying machine. Here is a movie of it in action. I suggest you click the fullscreen button to see the action better.

This was cool! The guy walking along beside the plow is the guy I talked to and turns out to be the project supervisor! He is making sure the insertion is going well since there are many things that can damage the cable.

The orange ribbon is a warning tape that is buried a foot or so below the surface to warn backhoe operators they are about to eat a fiber optic cable! Details here (pdf).

They are moving right along and should make their deadline. But they started from the cattle guard on public (BLM) land; once they get to the highway, they will have to deal with the private property east of the part they are doing. That part of the project is along the paved part of the road with narrow rights of way.

I wish them luck.

A Telephone Tea Party Poll

I was at my desk the other day and answered the phone. A friendly voice identified himself (itself?) as a surveyor for some Tea Party organization. Would I participate? My “yeah” was unacceptable. “Yes” worked.

#1: Did I think Obama was doing a good job? A quiet “no” didn’t work; Donna was asleep. “No” worked.

#2: Should Obamacare be repealed? With a tirade about all its problems, like the recording was gonna change anyone’s mind. “No”.

“Thank you for your time. *click*”