The Fiberoptic Project by Christmas — FAIL!

I went to the mailbox on Christmas Day and HAD to drive down Road Gulch to see how far they were since I could not see them from the mailbox. But they weren’t far down the gulch. About a half mile. With over a mile to go. Not even close to their goal.

This is near the first house on the north side of the road.

One thing I noticed was that the cable layer had no windows! That operator should be getting paid well! Note that there isn’t much cable on the spool either so this was a calculated stopping place.

Then I saw the project today on my trip to Salida to the doctor. Going down was not much different than Christmas Day! The big difference was they were burying duct instead of cable.

As we drove back up Road Gulch Road, I noticed the big backhoe (The Hammer) was gone. I figured they took it back before the end of the year to save rental money.

It had been parked near the curves since the project passed that point.

But when we turned the curve below where they were that morning, they hadn’t moved much! And, look, The Hammer! The semi had been there earlier and now we knew why. It appeared they had used The Hammer on the semi so it didn’t tear the paving up. There were tracks on the shoulder where the guy who kept waving me to go around while I was taking pictures, so it had been sitting there a while.

The cable layer had been refitted for laying fiberoptic duct.

TWO of them! But not all the duct is being furrowed in.

On each side of these driveways, a trench had been dug by the backhoe then the duct pulled into them plus some. Since there are no tracks in the driveway, they don’t have to worry about blocking it! Note the “Chinese finger traps” on the ends of the foreground ducts and the chain connected to them. This anchors the duct while it is pulled and fed out.

The duct can be laid under the phone and powerlines and connected in a box. I don’t know who gets to dig UNDER those lines. Later the actual cable will be pulled the entire length from here to the cattle guard using one of the ducts.

As I went around the trailer with The Hammer, I asked the road guard if they were gonna finish by New Years. He laughed and said, “This part, we hope!”. I had always assumed this valley was mostly stuff washed down from the mountains on each side. Obviously not if they have to use The Hammer to go 150′!

By modifying the contract for two ducts, the contract could be extended into next year. Or that is my guess. Lucky LCI.

Advertisements
Previous Post
Leave a comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: